Excavator Crossing - To get positioned on top of the area to excavate, the 20-H starts its climb up the ramp to the digging site at the Rochester & Genesee Valley Railroad Museum's Restoration Building.
Excavator Crossing - The 20-H excavator passes by the north end of the restoration building.
Big Dig Update - A panoramic view looking north from the restoration building. With one or two more solid days of digging to pull the bank on the right back further, the major excavation necessary to start laying the restoration building's access tracks should be complete. Prior to the tracks going down, the entire area will be graded and all necessary drainage addressed.
Down the Hill - Lehigh Valley Railroad #211 descends the hill into Industry yard after a run up the line.
LV 211 Stretches Its Legs - Members look on as the train crew prepares to head up the line with Lehigh Valley 211 and Nickel Plate 79.