Loaded up
With the new siding switch installed on the Livonia, Avon & Lakeville mainline, it was time to start to gather and deliver materials for the job of installing the siding. To bring some of the needed ties, the museum's custom built ex-Army 6x6 flatbed truck was loaded with three bundles of ties and sits ready to deliver them to the work area once some additional grading is completed. Completion of the new siding will allow us to store our string of ex-New York Central stainless steel coaches and free up space in our museum yards.