Adopt-A-Rivet... Help restore Lehigh Valley caboose #95100

After being saved from the scrap yard in October 2011 by the R&GVRRM and moved into the museum's shop in January 2012, the museum has been very busy working on the restoration of ex-Lehigh Valley Railroad caboose #95100.    The project has now reached the phase where we are beginning to put the car back together; starting with the exterior.   Part of this work is to install new lower steel side sheets on both sides of the car as the steel that was on there had badly corroded and was removed over the past few months.
LV #95100 in the R&GVRRM's Restoration Shop with its lower side sheets removed.  04.27.2013
To remove the sheets, we had to cut and remove nearly 250 rivets.
Volunteer, Rob Burz, cuts the rivets away from the side of LV#95100 to allow the lower portion of the side sheets to be cut and removed.  
Along with welding portions of the new sheets, we are going to need to acquire and reinstall those rivets.

This is where we hope you will help us and Adopt-A-Rivet!    $10 buys one rivet and we need to raise the funds for the equivalent of 250 rivets to allow us to purchase all of the materials needed for the job.  Would you please help us turn our Rivet Counter Cornell red by donating and adopting a rivet or rivets today?    Please click on the link below to donate online using PayPal.   Do not wish to use PayPal and prefer to send a check?   Perfect!   Please send your check made out to the Rochester & Genesee Valley Railroad Museum to:
 
Rochester & Genesee Valley Railroad Museum
Adopt-A-Rivet
P.O. Box 23326
Rochester, NY 14693-3326


To donate a rivet ($10) online via PayPal, please click here:


Like to adopt more than one rivet?   Please click the button below and fill in the dollar amount for the number of rivets you would like to adopt or any other dollar amount you would like:

Donations to the Rochester & Genesee Valley Railroad Museum are tax deductible to the extent allowed by law.  

Thank you very much for your support.   We are actively working on the #95100 now so your donation will have an immediate impact.  

UPDATE 06.26.2013 - The east side has all of its new steel side sheets welded in.   Now we just have to fasten the bottom and that is where your donation comes in and makes an immediate impact!

UPDATE 06.26.2013 - A wider view of all of the new east side steel welded in place.

Getting ready for opening day

Industry Yard was a flurry of activity this past weekend as we get ready for our Opening Day on May 19! Volunteers were out in force working on track, trains, and other items around the museum. Follow our Facebook fan page and stay up to date on our progress! Want to lend a hand? We're always looking for new volunteers! Photos by Otto Vondrak.

Volunteers Ryan Bailly, Dave Scheiderich, and Mike Walsh do a little track work at Switch 5.

Another crew was out getting our rare Fairbanks-Morse diesel ready for the upcoming operating season. That's a pre-lube pump they're using.

Volunteer Dave Peet scrapes paint off the depot and prepares the surfaces for sanding and priming.

Brakeman James Otto keeps an eye on the train while conductor Dave Scheiderich communicates with the engineer via radio to safely spot the train in Industry Yard.